A temporary structure built around a construction site to
A temporary structure built around a construction site to remove water and make the area reasonably dry is known as…
A temporary structure built around a construction site to remove water and make the area reasonably dry is known as…
The foundation is the backbone of any structure, providing stability and support for buildings, roads, bridges, and numerous other engineering…
1. An isobar is a line which connects all points below the ground surface at which ____. [A] The local…
1. Rise of water table above the ground surface ____. [A] Equal increase in pore water pressure and total stress…
1. What is the mass of the hammer in modified proctor test? [A] 2.5 kg [B] 3.93 kg [C] 4.89…
1. As compaction energy increases ___. [A] Both MDD and OMC increases [B] MDD decreases and OMC increases [C] MDD…
1. The soils which plot above the A-line in the plasticity chart are ____. [A] Sands [B] Organic Soils [C]…
1. When the plastic limit is equal to or greater than the liquid limit, then plasticity index is ___. [A]…
1. The collapsible soil is associated with ____. [A] Dune sand [B] Laterite soil [C] Loess [D] Black cotton soil…
1. The property of the soil mass which permits the seepage of water through its interconnecting voids, is called ____.…