RCC MCQs – 17 | CIVIL ENGINEERING | COMPETITIVE EXAMS
1. For pre-tensioned prestressed concrete, the grade of concrete shall be not less than[A] M30[B] M40[C] M60[D] M50 Answer: Option…
1. For pre-tensioned prestressed concrete, the grade of concrete shall be not less than[A] M30[B] M40[C] M60[D] M50 Answer: Option…
1. As per IS 456, the minimum cover to be provided for columns is[A] 50 mm[B] 25 mm[C] 40 mm[D]…
1. As per IS 456:2000, minimum period before striking form work for vertical surface of the columns _____.[A] 1 days[B]…
1. Uniformly distributed load on a concrete beam can be effectively counterbalanced by selecting _____.[A] Concentric cable[B] Eccentric cable[C] Parabolic…
1. The maximum deflection due to load in RCC beams in buildings is limited to _____. [A] Span/100[B] Span/250[C] Span/350[D]…
1. A doubly reinforced beam is considered as less economical as compared to a singly reinforced beam because _____.[A] The…
1. The maximum percentage reinforcement in beam shall not exceed of cross-sectional area as per IS:456.[A] 2.00%[B] 0.15%[C] 4.00%[D] 0.12%…
1. Maximum area of compression reinforcement for beams is _____.[A] 0.04 bD[B] 0.85bd/fy[C] 0.1 percent of web area[D] 0.5 percent…
1. Which of the following criteria is not considered under Limit State of Serviceability?[A] Fatigue[B] Vibration Limit[C] Durability consideration[D] Fire…
1. Design Bond stress for grade M40 and above is _____.[A] 1.9[B] 1.2[C] 1.7[D] 1.4 Answer: Option A 2.…