During the purification of water, if chlorine is applied beyond the stage of break-point

ENVIRONMENTAL ENGINEERING MCQs - Environmental Engineering

Wastewater treatment units is organic matter stabilized by

MCQs TRANSPORTATION ENGINEERING

Traffic capacity

MCQs TRANSPORTATION ENGINEERING

Noting the number of vehicles crossing a section of roadway

MCQs TRANSPORTATION ENGINEERING

Expansion joints in rigid pavements are provided for

  • Latest
  • Popular
  • Trending
  • ENVIRONMENTAL ENGINEERING MCQs - Environmental Engineering
    During the purification of water, if chlorine is applied beyond the stage of break-point
  • ENVIRONMENTAL ENGINEERING MCQs - Environmental Engineering
    Wastewater treatment units is organic matter stabilized by
  • Traffic capacity
    MCQs TRANSPORTATION ENGINEERING
    Traffic capacity
  • Noting the number of vehicles crossing a section of roadway
    MCQs TRANSPORTATION ENGINEERING
    Noting the number of vehicles crossing a section of roadway
  • IRRIGATION ENGINEERING
    Benefits Of Irrigation | Irrigation Engineering | Irrigation System
  • Uncategorized
    FINDING ROOT OF EQUATION USING NEWTON RAPHSON METHOD
  • Uncategorized
    GAUSS JORDAN METHOD
  • HYDROLOGY
    RAINDROP SIZE MEASUREMENT TECHNIQUES
  • ENVIRONMENTAL ENGINEERING MCQs - Environmental Engineering
    During the purification of water, if chlorine is applied beyond the stage of break-point
  • ENVIRONMENTAL ENGINEERING MCQs - Environmental Engineering
    Wastewater treatment units is organic matter stabilized by
  • Traffic capacity
    MCQs TRANSPORTATION ENGINEERING
    Traffic capacity
  • Noting the number of vehicles crossing a section of roadway
    MCQs TRANSPORTATION ENGINEERING
    Noting the number of vehicles crossing a section of roadway
CONSTRUCTION MANAGEMENT MULTIPLE CHOICE QUESTIONS

Construction Planning and Management MCQs -1 | Civil Engineering MCQs | Competitive Exams

1. Preliminary project report for a road project must contain ______. [A] The detailed estimated cost based on detailed design[B]…

MULTIPLE CHOICE QUESTIONS RCC

RCC MCQs – 17 | CIVIL ENGINEERING | COMPETITIVE EXAMS

1. For pre-tensioned prestressed concrete, the grade of concrete shall be not less than[A] M30[B] M40[C] M60[D] M50 Answer: Option…

MULTIPLE CHOICE QUESTIONS RCC

RCC MCQs – 16 | CIVIL ENGINEERING | COMPETITIVE EXAMS

1. As per IS 456, the minimum cover to be provided for columns is[A] 50 mm[B] 25 mm[C] 40 mm[D]…

MULTIPLE CHOICE QUESTIONS RCC

RCC MCQs – 15 | CIVIL ENGINEERING | COMPETITIVE EXAMS

1. As per IS 456:2000, minimum period before striking form work for vertical surface of the columns _____.[A] 1 days[B]…

MULTIPLE CHOICE QUESTIONS RCC

RCC MCQs – 14 | CIVIL ENGINEERING | COMPETITIVE EXAMS

1. Uniformly distributed load on a concrete beam can be effectively counterbalanced by selecting _____.[A] Concentric cable[B] Eccentric cable[C] Parabolic…

MULTIPLE CHOICE QUESTIONS RCC

RCC MCQs – 13 | CIVIL ENGINEERING | COMPETITIVE EXAMS

1. The maximum deflection due to load in RCC beams in buildings is limited to _____. [A] Span/100[B] Span/250[C] Span/350[D]…

MULTIPLE CHOICE QUESTIONS RCC

RCC MCQs – 12 | CIVIL ENGINEERING | COMPETITIVE EXAMS

1. A doubly reinforced beam is considered as less economical as compared to a singly reinforced beam because _____.[A] The…

MULTIPLE CHOICE QUESTIONS RCC

RCC MCQs – 11 | CIVIL ENGINEERING | COMPETITIVE EXAMS

1. The maximum percentage reinforcement in beam shall not exceed of cross-sectional area as per IS:456.[A] 2.00%[B] 0.15%[C] 4.00%[D] 0.12%…

MULTIPLE CHOICE QUESTIONS RCC

RCC MCQs – 10 | CIVIL ENGINEERING | COMPETITIVE EXAMS

1. Maximum area of compression reinforcement for beams is _____.[A] 0.04 bD[B] 0.85bd/fy[C] 0.1 percent of web area[D] 0.5 percent…

MULTIPLE CHOICE QUESTIONS RCC

RCC MCQs – 9 | CIVIL ENGINEERING | COMPETITIVE EXAMS

1. Which of the following criteria is not considered under Limit State of Serviceability?[A] Fatigue[B] Vibration Limit[C] Durability consideration[D] Fire…

Posts pagination

1 … 5 6 7 … 39

Categories

  • ADVANCED SURVEYING
  • ArcGIS
  • BUILDING CONSTRUCTION
  • BUILDING MATERIALS
  • CIVIL ENGINEERING
  • CONSTRUCTION EQUIPMENTS
  • CONSTRUCTION MANAGEMENT
  • CYCLONES
  • Design of Steel Structures
  • DETENTION BASIN
  • DIAPHRAGM WALL
  • EARTHQUAKES
  • Engineering Mathematics
  • ENVIRONMENTAL ENGINEERING
  • EXCEL
  • FLOOD DAMAGES
  • FLUID MECHANICS
  • GEOTECHNICAL ENGINEERING
  • HIGHWAY ENGINEERING
  • HYDROLOGY
  • IMPORTANT MODEL SELECTION CRITERIA IN WATERSHED MODELLING
  • IRRIGATION ENGINEERING
  • LINEAR PROGRAMMING
  • MCQs
  • MCQs
  • MCQs
  • MCQs
  • MCQs
  • MCQs – Building Materials
  • MCQs – Environmental Engineering
  • Mechanics of Solids
  • MULTIPLE CHOICE QUESTIONS
  • NUMERICAL AND STATISTICAL METHODS
  • OPERATION RESEARCH
  • QGIS
  • RCC
  • RESEARCH APTITUDE
  • Scope of Civil Engineering
  • Soil Mechanics
  • STRENGTH OF MATEERIALS
  • SURVEYING
  • TRAFFIC ENGINEERING
  • TRANSPORTATION ENGINEERING
  • TSUNAMI
  • Uncategorized
  • WATER RESOURCES ENGINEERING
  • WATERSHED MANAGEMENT
  • WATERSHED MODELLING

View More

ENVIRONMENTAL ENGINEERING MCQs - Environmental Engineering

During the purification of water, if chlorine is applied beyond the stage of break-point

ENVIRONMENTAL ENGINEERING MCQs - Environmental Engineering

Wastewater treatment units is organic matter stabilized by

MCQs TRANSPORTATION ENGINEERING

Traffic capacity

MCQs TRANSPORTATION ENGINEERING

Noting the number of vehicles crossing a section of roadway

CIVILELITE

CIVILELITE