Hydrology MCQs – 14 | GATE | ESE | GPSC | CIVIL ENGINEERING COMPETITIVE EXAMS
1. Standard Project Flood for the drainage area involved is the flood that [A] is sure to be equalled in…
1. Standard Project Flood for the drainage area involved is the flood that [A] is sure to be equalled in…
1. The hydrologic flood routing uses [A] continuity equation only [B] momentum equation only [C] both continuity and momentum equations…
1. The use of the unit hydrograph for estimating floods is limited to catchments of size less than [A] 50…
1. Runoff increases with [A] increase in the infiltration capacity [B] increase in intensity of rain [C] increase in permeability…
1. Atmometer is used to measure ____. [A] Evaporation [B] Transpiration [C] Evapotranspiration [D] All of the above Answer: Option…
1. Which of the following statement(s) is/ are correct? (i) Normal ratio method is used for estimating missing annual precipitation…
1. How many additional rain gauges are required in a catchment, if the error allowed in estimation of mean rainfall…
1. Floats are used to measure [A] Discharge of stream [B] Velocity of stream [C] Flood discharge [D] Afflux Answer:…
1. An isobar is a line which connects all points below the ground surface at which ____. [A] The local…
1. Rise of water table above the ground surface ____. [A] Equal increase in pore water pressure and total stress…