Construction Planning and Management MCQs -6 | Civil Engineering MCQs | Competitive Exams
1. The reduction in project time normally results in: [A] Increasing the direct cost and decreasing the indirect cost [B]…
1. The reduction in project time normally results in: [A] Increasing the direct cost and decreasing the indirect cost [B]…
1. Interfering float is the difference between _____. [A] Total float and independent float[B] Total float and free float[C] Free…
1. A ____ is similar to an activity but it does not consume any resources.[A] Dummy[B] Event[C] Slack[D] None of…
1. The system of organization introduced by F.W. Taylor is known as _____.[A] Effective Organization[B] Functional Organization[C] Line Organization[D] Line…
1. Mile stone chart is an improvement over ______. [A] Bar chart[B] OPST scheduling[C] CPM Scheduling[D] PERT scheduling Answer: Option…
1. Preliminary project report for a road project must contain ______. [A] The detailed estimated cost based on detailed design[B]…
1. For pre-tensioned prestressed concrete, the grade of concrete shall be not less than[A] M30[B] M40[C] M60[D] M50 Answer: Option…
1. As per IS 456, the minimum cover to be provided for columns is[A] 50 mm[B] 25 mm[C] 40 mm[D]…
1. As per IS 456:2000, minimum period before striking form work for vertical surface of the columns _____.[A] 1 days[B]…
1. Uniformly distributed load on a concrete beam can be effectively counterbalanced by selecting _____.[A] Concentric cable[B] Eccentric cable[C] Parabolic…