1. Silt charge is defined as _____. [A] Average size of silt particle[B] Volume of silt particles flowing with unit…
1. Silt charge is defined as _____. [A] Average size of silt particle[B] Volume of silt particles flowing with unit…
1. According to Kennedy, non-silting and non-scouring velocity is called _____. [A] Optimal velocity[B] Critical velocity[C] Mean velocity[D] Average velocity…
1. Permanent wilting point moisture content for a crop represents the _____.[A] hygroscopic water [B] capillary water [C] field capacity…
1. In estimation of the crop water requirements, the delta of a crop is expressed in ____ unit.[A] Hectare pre…
1. Well irrigation is a type of _____. [A] Inundation irrigation [B] Infiltration irrigation [C] Lift irrigation [D] Gravity irrigation…
1. Standard Project Flood for the drainage area involved is the flood that [A] is sure to be equalled in…
1. The hydrologic flood routing uses [A] continuity equation only [B] momentum equation only [C] both continuity and momentum equations…
1. The use of the unit hydrograph for estimating floods is limited to catchments of size less than [A] 50…
1. Runoff increases with [A] increase in the infiltration capacity [B] increase in intensity of rain [C] increase in permeability…
1. Atmometer is used to measure ____. [A] Evaporation [B] Transpiration [C] Evapotranspiration [D] All of the above Answer: Option…