ENVIRONMENTAL ENGINEERING MCQs - Environmental Engineering

During the purification of water, if chlorine is applied beyond the stage of break-point

ENVIRONMENTAL ENGINEERING MCQs - Environmental Engineering

Wastewater treatment units is organic matter stabilized by

MCQs TRANSPORTATION ENGINEERING

Traffic capacity

MCQs TRANSPORTATION ENGINEERING

Noting the number of vehicles crossing a section of roadway

MCQs TRANSPORTATION ENGINEERING

Expansion joints in rigid pavements are provided for

  • Latest
  • Popular
  • Trending
  • ENVIRONMENTAL ENGINEERING MCQs - Environmental Engineering
    During the purification of water, if chlorine is applied beyond the stage of break-point
  • ENVIRONMENTAL ENGINEERING MCQs - Environmental Engineering
    Wastewater treatment units is organic matter stabilized by
  • Traffic capacity
    MCQs TRANSPORTATION ENGINEERING
    Traffic capacity
  • Noting the number of vehicles crossing a section of roadway
    MCQs TRANSPORTATION ENGINEERING
    Noting the number of vehicles crossing a section of roadway
  • IRRIGATION ENGINEERING
    Benefits Of Irrigation | Irrigation Engineering | Irrigation System
  • Uncategorized
    FINDING ROOT OF EQUATION USING NEWTON RAPHSON METHOD
  • Uncategorized
    GAUSS JORDAN METHOD
  • HYDROLOGY
    RAINDROP SIZE MEASUREMENT TECHNIQUES
  • ENVIRONMENTAL ENGINEERING MCQs - Environmental Engineering
    During the purification of water, if chlorine is applied beyond the stage of break-point
  • ENVIRONMENTAL ENGINEERING MCQs - Environmental Engineering
    Wastewater treatment units is organic matter stabilized by
  • Traffic capacity
    MCQs TRANSPORTATION ENGINEERING
    Traffic capacity
  • Noting the number of vehicles crossing a section of roadway
    MCQs TRANSPORTATION ENGINEERING
    Noting the number of vehicles crossing a section of roadway
MULTIPLE CHOICE QUESTIONS RCC

RCC MCQs – 8 | CIVIL ENGINEERING | COMPETITIVE EXAMS

1. Design Bond stress for grade M40 and above is _____.[A] 1.9[B] 1.2[C] 1.7[D] 1.4 Answer: Option A   2.…

MULTIPLE CHOICE QUESTIONS RCC

RCC MCQs – 7 | CIVIL ENGINEERING | COMPETITIVE EXAMS

1. The mode of failure of a very short masonry member having height/thickness ratio of less than 4 is by…

MULTIPLE CHOICE QUESTIONS RCC

RCC MCQs – 6 | CIVIL ENGINEERING | COMPETITIVE EXAMS

1. The minimum cover prescribed in the code for flexural reinforcement in all footings _____.[A] 75mm[B] 50mm[C] 40mm[D] 60mm Answer:…

MULTIPLE CHOICE QUESTIONS RCC

RCC MCQs – 5 | CIVIL ENGINEERING | COMPETITIVE EXAMS

1. In which of the following method, safety measures appropriate choice of ‘Load Factor’?[A] Working Stress Method[B] Ultimate Strength Method[C]…

MULTIPLE CHOICE QUESTIONS RCC

RCC MCQs – 4 | CIVIL ENGINEERING | COMPETITIVE EXAMS

1. Tensile stresses in concrete arise on account of the following:(i) Direct tension(ii) Flexural tension(iii) Diagonal tension (shear)(iv) Temperature and…

MULTIPLE CHOICE QUESTIONS RCC

RCC MCQs – 3 | CIVIL ENGINEERING | COMPETITIVE EXAMS

1. In limit state approach, the spacing of main reinforcement primarily controls _____.[A] Cracking[B] Durability[C] Collapse[D] Deflection Answer: Option A…

MULTIPLE CHOICE QUESTIONS RCC

RCC MCQs – 2 | CIVIL ENGINEERING | COMPETITIVE EXAMS

1. The maximum compressive strain permitted in R.C.C. columns at failure load is _____. [A] 0.002 [B] 0.003 [C] 0.035…

MULTIPLE CHOICE QUESTIONS RCC

RCC MCQs 1 | CIVIL ENGINEERING | COMPETITIVE EXAMS

1. As per IS 456:2000, Minimum grade of concrete for plain concrete exposed to seacoast is _____. [A] M20 [B]…

IRRIGATION ENGINEERING MULTIPLE CHOICE QUESTIONS

Irrigation Engineering MCQs 12 | CIVIL ENGINEERING COMPETITIVE EXAMS

1. Which of the following canal structures is used to remove surplus water from an irrigation channel into a natural…

IRRIGATION ENGINEERING MULTIPLE CHOICE QUESTIONS

Irrigation Engineering MCQs 11 | CIVIL ENGINEERING COMPETITIVE EXAMS

1. Finally formed berms in canals are provided for ______. [A] Protection of banks erosion by the waves[B] Control of seepage losses[C] Strengthening…

Posts pagination

1 … 6 7 8 … 39

Categories

  • ADVANCED SURVEYING
  • ArcGIS
  • BUILDING CONSTRUCTION
  • BUILDING MATERIALS
  • CIVIL ENGINEERING
  • CONSTRUCTION EQUIPMENTS
  • CONSTRUCTION MANAGEMENT
  • CYCLONES
  • Design of Steel Structures
  • DETENTION BASIN
  • DIAPHRAGM WALL
  • EARTHQUAKES
  • Engineering Mathematics
  • ENVIRONMENTAL ENGINEERING
  • EXCEL
  • FLOOD DAMAGES
  • FLUID MECHANICS
  • GEOTECHNICAL ENGINEERING
  • HIGHWAY ENGINEERING
  • HYDROLOGY
  • IMPORTANT MODEL SELECTION CRITERIA IN WATERSHED MODELLING
  • IRRIGATION ENGINEERING
  • LINEAR PROGRAMMING
  • MCQs
  • MCQs
  • MCQs
  • MCQs
  • MCQs
  • MCQs – Building Materials
  • MCQs – Environmental Engineering
  • Mechanics of Solids
  • MULTIPLE CHOICE QUESTIONS
  • NUMERICAL AND STATISTICAL METHODS
  • OPERATION RESEARCH
  • QGIS
  • RCC
  • RESEARCH APTITUDE
  • Scope of Civil Engineering
  • Soil Mechanics
  • STRENGTH OF MATEERIALS
  • SURVEYING
  • TRAFFIC ENGINEERING
  • TRANSPORTATION ENGINEERING
  • TSUNAMI
  • Uncategorized
  • WATER RESOURCES ENGINEERING
  • WATERSHED MANAGEMENT
  • WATERSHED MODELLING

View More

ENVIRONMENTAL ENGINEERING MCQs - Environmental Engineering

During the purification of water, if chlorine is applied beyond the stage of break-point

ENVIRONMENTAL ENGINEERING MCQs - Environmental Engineering

Wastewater treatment units is organic matter stabilized by

MCQs TRANSPORTATION ENGINEERING

Traffic capacity

MCQs TRANSPORTATION ENGINEERING

Noting the number of vehicles crossing a section of roadway

CIVILELITE

CIVILELITE